Advantages of photovoltaic pile driver?

Publication Date: Apr 08, 2023



1. The piling speed is fast, and the pile can be driven to a depth of 6 meters in an average of 3 minutes, that is, a drill hole can be drilled in 3 minutes.


2. Low fuel consumption, which is about half of that of ordinary piling machines. Greatly reduce the cost of construction work.


3. The drill bit is made of manganese steel, which is suitable for various geological environments after special processing.


4. The design is reasonable, the appearance is beautiful, and the operation is simple. It can move forward and backward, rotate left and right 270 degrees, and 360 degrees for two product options. Fast positioning, fast pile driving, fast pile pulling, high efficiency, etc., can also be processed according to user requirements.


Related News
Read More >>
Bulldozer Blade Types: Core Configuration for Adapting to Different Operating ScenariosBulldozer Blade Types: Core Configuration for Adapting to Different Operating Scenarios
Jul 24, 2025
In earthwork, mining operations, and road construction, bulldozer blade types directly affect equipment efficiency and application range. Different bulldozer blade types feature unique structural designs and functional focuses—choosing the ...
Swamp bulldozer: An Efficient Solution for Operations in Muddy EnvironmentsSwamp bulldozer: An Efficient Solution for Operations in Muddy Environments
Jul 24, 2025
In muddy scenarios such as swamp development, wetland management, and farmland water conservancy transformation, the swamp bulldozer, with its unique low ground pressure design and strong power, has become a core equipment to break through t ...
Rough terrain forklift with highest load capacity: A High-performance Solution for Heavy-duty Outdoor OperationsRough terrain forklift with highest load capacity: A High-performance Solution for Heavy-duty Outdoor Operations
Jul 24, 2025
In scenarios such as heavy-duty mine transportation, large equipment loading/unloading, and infrastructure material handling, the rough terrain forklift with highest load capacity has become a core hub connecting the material supply chain an ...
All products are guaranteed for 12 months!