What is the installation process of down-the-hole drilling rig? drilling rig for sale

Publication Date: Mar 15, 2023

03.jpg02.jpg

1. Prepare the rock drilling cavern. The cavern specification can be determined according to the drilling method. Generally, the cavern height is 2.6-2.8 meters when drilling horizontal holes, and the cavern width is 2.5 meters and the height is 2.8-3 meters when drilling upward, downward or inclined holes.

2. Lead the gas-water pipeline and lighting line to the vicinity of the working face for use.

3. According to the requirements of hole design, the pillar shall be erected firmly. The upper and lower ends of the pillar shall be padded with wood plates, and the horizontal shaft and snap ring shall be installed on the pillar according to a certain height and direction. The machine shall be lifted by the hand winch, fixed on the pillar according to the required angle, and then the hole direction of the drill shall be adjusted.



Related News
Read More >>
Bulldozer Blade Types: Core Configuration for Adapting to Different Operating ScenariosBulldozer Blade Types: Core Configuration for Adapting to Different Operating Scenarios
Jul 24, 2025
In earthwork, mining operations, and road construction, bulldozer blade types directly affect equipment efficiency and application range. Different bulldozer blade types feature unique structural designs and functional focuses—choosing the ...
Swamp bulldozer: An Efficient Solution for Operations in Muddy EnvironmentsSwamp bulldozer: An Efficient Solution for Operations in Muddy Environments
Jul 24, 2025
In muddy scenarios such as swamp development, wetland management, and farmland water conservancy transformation, the swamp bulldozer, with its unique low ground pressure design and strong power, has become a core equipment to break through t ...
Rough terrain forklift with highest load capacity: A High-performance Solution for Heavy-duty Outdoor OperationsRough terrain forklift with highest load capacity: A High-performance Solution for Heavy-duty Outdoor Operations
Jul 24, 2025
In scenarios such as heavy-duty mine transportation, large equipment loading/unloading, and infrastructure material handling, the rough terrain forklift with highest load capacity has become a core hub connecting the material supply chain an ...
All products are guaranteed for 12 months!